HENGFENGYOU SUBSTATION Co., Ltd

HENGFENGYOU SUBSTATION Co., Ltd

sales@hfy-substation.com

+86 158 0639 8816

Home > Product > Gas Insulated Switchgear > >ZHW-126kV Plug-in Hybrid Gas Insulated Switchgear (HGIS)

ZHW-126kV Plug-in Hybrid Gas Insulated Switchgear (HGIS)

Payment Type:
L/C,T/T
Incoterm:
FOB,CFR,CIF
Min. Order:
1 Set/Sets
Delivery Time:
30 Days
Transportation:
Ocean,Land,Air
  • Product Description
Overview
Product Attributes

Model No.:  ZHW-126kV Plug-in

Brand:  HENGFENGYOU

Application:  Power Transmission and Distribution, High Voltage (HV) Substations, Space-Constrained Grid Retrofits, Rapid Deployment Projects

Phase:  Three

Rated Voltage:  126 kV

Rated current:  2000 A / 2500 A / 3150 A (Rated short-circuit breaking current: 31.5 kA / 40 kA)

Frequency:  50Hz / 60Hz

Degree of protection:  Enclosure IP65 / Gas Compartment IP67 / Control Cabinet IP55

Standard:  IEC 62271-203, IEEE C37.122, GB/T 7674

Certificate:  ISO9001, CE, KEMA / Type Test Certified

Shell Material:  High-Strength Corrosion-Resistant Aluminum Alloy

Origin:  China

Packaging:  Sea-worthy cases with 3D impact recorders

Delivery Time:  75-90 Days

Product Feature
ZHW-126kV Plug-in Hybrid Gas Insulated Switchgear (HGIS)
Product description
Product Overview: ZHW-126kV Plug-in Hybrid Gas Insulated Switchgear (HGIS)
The ZHW-126kV Plug-in Hybrid Gas Insulated Switchgear (HGIS) engineered by Hengfengyou Electric represents the pinnacle of high-voltage transmission and distribution technology. Designed for utility-grade substations, large-scale renewable energy integration (solar/wind plants), and heavy industrial grids, this 126kV HGIS system features an advanced plug-in, factory-assembled design. It integrates circuit breakers, disconnectors, and earthing switches into a single gas-insulated bay while allowing for flexible, modular connections to open-air busbars.
With an ultra-compact footprint, superior dielectric strength of SF6 gas, and maintenance-free design, the ZHW-126kV series ensures maximum grid reliability, operational safety, and optimal environmental resistance in extreme climates worldwide.
Core Engineering Advantages of ZHW-126kV Plug-in Hybrid High Voltage Switchgear
Ultra-Compact Footprint & Space Saving: Utilizing premium SF6 gas as the insulation and arc-extinguishing medium for core components, the safety clearance distance is drastically minimized. It saves up to 50% to 70% of land space compared to traditional air-insulated substations (AIS), significantly reducing civil construction and land acquisition costs.
Maximum Safety & Zero Fault Risk: All critical bay components are securely enclosed in a grounded aluminum alloy tank, completely eliminating accidental touch risks, environmental pollution hazards, and internal arc propagation.
Extreme Weather Adaptability: The hermetically sealed switchgear structure protects internal components from external variables like high humidity, salt spray, desert dust, heavy snow, and high altitudes. Ideal for coastal industries, mining operations, and remote grid hubs where open-air switchgear is vulnerable.
Intelligent Digital O&M Ready: Equipped with advanced digital smart density monitors, online partial discharge (PD) sensors, and fiber-optic telemetry interfaces to support automated, unmanned substation monitoring and predictive asset maintenance.
High-Value B2B FAQs: Procuring 126kV Plug-in Hybrid Gas Insulated Switchgear
Q: What is the delivery time for the ZHW-126kV HGIS system?
A: Our standard delivery time is 75 to 90 days from the confirmation of technical drawings. This fast-track manufacturing cycle helps international EPC contractors meet tight project milestones without delaying substation commissioning.
Q: What warranty policy does Hengfengyou Electric offer for this 126kV HGIS?
A: We provide a standard 12-month quality warranty from the date of commissioning. For major utility grid projects and long-term infrastructure deployments, the warranty period can be extended up to 5 years upon request, backed by full life-cycle technical support.
Q: Does Hengfengyou Electric support KEMA testing and international third-party inspection?
A: Yes. All our high-voltage HGIS systems undergo rigorous factory acceptance testing (FAT). We fully support third-party witness inspections by globally recognized laboratories such as KEMA, SGS, and Bureau Veritas (BV) to ensure complete compliance with your local grid standards.
Q: How do you guarantee transport safety and provide installation support?
A: Components are shipped with positive gas pressure and equipped with 3D impact recorders to track transport handling. For site deployment, our specialized engineering team provides on-site or remote technical supervision for mechanical assembly, SF6 gas filling, and site acceptance testing (SAT).
Email to this supplier
  • *To:
    Mr. Hengfengyou
  • *name:
  • *email:
  • *Message:
    Your message must be between 20-8000 characters
Home Products Power Transformer Power Transformer Up To 132kv 50MVA 115/38.5KV 3 phase oil immersed power transformer
Related Products List

Home

Product

Phone

About Us

Inquiry