HENGFENGYOU SUBSTATION Co., Ltd

HENGFENGYOU SUBSTATION Co., Ltd

sales@hfy-substation.com

+86 158 0639 8816

Home > Product > Compact Substation > >New Energy Storage & Step-up Integrated Cabin | BESS Prefabricated Container - Hengfengyou Electric

New Energy Storage & Step-up Integrated Cabin | BESS Prefabricated Container - Hengfengyou Electric

Payment Type:
L/C,T/T
Incoterm:
FOB,CFR,CIF
Min. Order:
1 Set/Sets
Delivery Time:
30 Days
Transportation:
Ocean,Land,Air
  • Product Description
Overview
Product Attributes

Model No.:  Custom Specification Based on Project Requirements

Brand:  HENGFENGYOU

Application:  Utility-Scale Battery Energy Storage Systems (BESS), Renewable Energy Peak Shaving, Smart Micro-grids

Phase:  Three

Rated Voltage:  10kV / 33kV / 35kV

Rated current:  Standard Layout up to 5000A

Frequency:  50Hz / 60Hz

Degree of protection:  IP54 / IP55 Outdoor Enclosure

Standard:  IEC 62271-202, IEC 62619, UL 9540, IEEE 1547

Certificate:  ISO9001, CE, KEMA, SGS, Bureau Veritas (BV)

Shell Material:  Standard Corten-A Maritime Container Structure / Thermal Insulated Composite Panels

Origin:  China

Packaging:  Heavy-Duty Export Sea-Worthy Packing with 3D Impact Recorders

Delivery Time:  45 - 60 Days

Product Feature
Energy Storage & Step-up Integrated Cabin, BESS Step-up Container, Integrated PCS Transformer Cabin, Battery Energy Storage Substation, Grid-scale Storage Substation, Hengfengyou Electric
Product description
Energy Storage & Step-up Integrated Cabin Manufacturer Overview
Hengfengyou Electric’s Energy Storage & Step-up Integrated Cabin is a highly advanced, all-in-one power conversion and voltage elevation solution designed for utility-scale Battery Energy Storage Systems (BESS). Built in compliance with strict international safety and grid-connection standards, this modular prefabricated container layout seamlessly bridges the gap between DC battery banks and high-voltage AC utility networks, reducing field installation labor and optimizing project footprint for smart micro-grids and peak-shaving centers.
Energy Storage & Step-up Integrated Cabin Structural Layout and Compartmentalization
This specialized container design features an ultra-efficient internal layout that partitions the cabin into separate, isolated technical zones: the Power Conversion System (PCS) room, the low-voltage distribution and control bay, and the step-up transformer compartment. By packing the bidirectional inverters and the step-up loop into a single standardized maritime enclosure, the design cuts onsite civil engineering prep work and simplifies complex field cable terminations.
Energy Storage & Step-up Integrated Cabin Enclosure and Thermal Insulation
The outer shell is constructed from heavy-duty Corten-A weathering steel or specialized thermal insulated composite panels designed for rugged outdoor deployment. Delivering a verified IP54 or IP55 protection rating, the robust enclosure prevents dust, heavy rain, and moisture from reaching the sensitive digital controls, while integrated automotive-grade rubber seals shield internal automation units from extreme open-field weather.
Thermal Simulation & Smart Liquid Cooling of Prefabricated Cabin
Using ANSYS computational fluid dynamics thermal simulation, the cabin integrates independent liquid-cooling loops or industrial forced-air HVAC systems. The automated climate controls dynamically adjust airflow and coolant circulation based on real-time internal heat metrics, eliminating hotspots and ensuring the bidirectional PCS and step-up transformer operate smoothly at full capacity in ambient outdoor environments up to +50°C.
C5-M Premium Marine-Grade Anti-Corrosion Coating for Outdoor Substation Enclosure
To support an active operational runtime exceeding 30 years without structural rust, all external steel surfaces undergo automatic Sa2.5 grade grit blasting. They receive a specialized multi-layer zinc-rich epoxy paint application with a total dry film thickness of 320 micrometers or greater, providing top-tier protection against high solar UV exposure and high-salt coastal atmospheres.
Smart Grid Integration and Integrated Safety Automation Systems
The control center comes pre-wired with industrial Remote Terminal Units (RTUs), an advanced Energy Management System (EMS) interface, and automated multi-stage aerosol fire suppression loops. Fully compatible with the IEC 61850 protocol, the system offers plant managers seamless remote visibility over transformer oil behavior, PCS efficiency, ambient humidity levels, and multi-point smoke detection alarms.
Frequently Asked Questions
Q1: What standard warranty framework does Hengfengyou Electric offer, and can it be extended?
A: We provide a standard warranty of 18 to 24 months. For large international EPC tenders, we support extended warranties up to 5 years (60 months) to guarantee project bankability.
Q2: How does your delivery lead time compare to major international competitors?
A: Thanks to our vertical supply chain—manufacturing transformers, switchgear, and enclosures in-house—our delivery is 30% to 40% faster than the industry average. Standard customized units require only 45 to 60 days to Factory Acceptance Testing (FAT).
Q3: Why is your pricing structure more competitive without sacrificing premium equipment reliability?
A: We offer factory-direct wholesale pricing with zero middleman markups. Cost savings from automated manufacturing are reinvested into premium materials like CRGO steel laminations and 99.99% oxygen-free copper conductors.
Q4: What are the main engineering benefits of integrating the PCS and the step-up transformer inside a single cabin?
A: Traditional layouts require separate concrete foundations and extensive underground cabling between the PCS container and the external step-up transformer. Our integrated cabin eliminates these requirements by matching and pre-wiring the PCS and transformer at the factory. This reduces the total physical footprint by over 35%, lowers total shipping costs, and shortens onsite commissioning windows down to just a few days.
Q5: How does this integrated cabin handle fire safety and thermal runaway risks associated with energy storage?
A: Safety is handled through strict compartment isolation and automated protection loops. The transformer room is physically walled off from the electronic PCS bay with heavy fire-rated steel barriers. Additionally, the cabin is equipped with independent multi-point smoke and gas sensors tied to a smart aerosol fire suppression system. If abnormal gas spikes or heat levels are detected, the system automatically cuts grid connection breakers and activates localized fire suppression to isolate the issue immediately.
Email to this supplier
  • *To:
    Mr. Hengfengyou
  • *name:
  • *email:
  • *Message:
    Your message must be between 20-8000 characters
Home Products Power Transformer Power Transformer Up To 132kv 50MVA 115/38.5KV 3 phase oil immersed power transformer
Related Products List

Home

Product

Phone

About Us

Inquiry